24 May 2013 
 

Draft Agenda for Baseline Design Review meeting

The main purpose of the BDR is for the Contractor to present and justify and for ESA to approve the System Requirements detailed in the Pilot System Architecture document, and the pilot utilisation activities detailed in the Pilot Utilisation Plan document. The successful completion of the BDR will marks the beginning of the development activities.

For more info about the BDR meeting, please see the ARTE 3-4 Management Requirements of “Satcom Applications”.

These agendas apply to ARTES 3-4 projects based on the call for proposal issued before April 2012.


Document   Extension Filesize
Draft Agenda for Baseline Design Review meeting Download or View docx (19 kb)

Last Update: 22 Jan 2013
 
Related Links
 
  Copyright 2000 - 2013 © European Space Agency. All rights reserved.